- The sequential operation of the controller that goes through the ladder diagram from top to bottom of the ladder.
- In this process it updates all the outputs corresponding to the inputs.
- SCAN takes place from left to right of each rung.
- Usually SCAN time is in milliseconds and it is a continuous process.
Monday, February 5, 2018
What is SCAN in PLC ?
Labels:
PLC
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment